Shanghai-Nanjing railway between the two places will achieve 1 hour netting Louis Vuitton

March 10, 2010 | tags Louis Vuitton  Louis Vuitton handbags  Louis Vuitton replica   | views
Comments 0

Take a train to Shanghai, will be no need for an hour. Yesterday, reporter learned from the Shanghai-Nanjing intercity railway construction units,Louis Vuitton handbags the four Railway Bureau, the Shanghai-Nanjing intercity railway operator has identified a speed of 350 km, will be May 1 "trial run", June 1 trial operation, July 1 officially operational.
4 Bureau of China Railway, introduced yesterday by the relevant responsible person said that the current Shanghai-Nanjing intercity railway track-laying work on the Nanjing section at the end of the track now being "fine tune" work to ensure that the track down, high, low points, and welding Quality fully meet the design requirements. April 1, replica Louis Vuitton handbags the railway line will have electric power, signals etc., "the FBI in the test" to ensure that the entire operating system in line with the train "trial run" requirement. "May 1, the Shanghai-Nanjing Intercity train will stop in Nanjing Station to Xianlin paragraphs interval 'trial run' in order to further testing, debugging the various operating systems." Bureau of China Railway four relevant person in charge,Louis Vuitton replica said the end of the train test run After the running of the train will be in accordance with established schedules, conducted on June 1 trial operation of Shanghai-Nanjing across the board to ensure that the formal operations July 1 when the operation control of various systems to achieve the best results, ensure that passengers travel comfortable and safe.
According to reports,replica handbags paypal May 1 Shanghai-Nanjing Inter-City Train "trial run", it will be the impact of "maximum speed" 390 km -400 km; formal operation, it will maintain the average speed of 350 km. By then, the Shanghai-Nanjing Intercity train ride to Shanghai, the fastest less than 1 hour (Shanghai-Nanjing direct trains).
Shanghai-Nanjing Intercity Railway was originally designed speed of 250 km / hr. To improve the efficiency of railway operations to further shorten the time from the cities of Nanjing, the relevant departments to gradually improve the design standards,replica handbags sale improve the construction process, will eventually "Operational speed" as 350 km / hr. To this end, the Shanghai-Nanjing Intercity Railway original "has fragments track," All the words "non-ballast track," "seamed rails" all words "seamless rails," and some "roadbed track," changed to "elevated track."




发表评论:

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。